Wire EDM Catalogue as a PDF-file

The route to rational production in wire EDM machines can be
summarised in three steps - mounting,
reference system and
automation.

First of all, the workpiece needs to be positioned and
secured in the working area of the machine, preferably on the zero
line, and with the risk of collision with the machine's wire guides
reduced to a minimum. And so firmly that it can handle the high
flushing pressures of modern machines.

Once the problem of effective mounting of the workpiece in the
machine has been solved, the next step is to minimise downtimes
when retooling the machine.
Technical developments of the machines in recent years have
resulted in significantly higher material removal rates. But you
won't benefit from this potential if the machine is idle for
lengthy, troublesome retooling. So the aim must be to minimise
retooling times with the machine idle.
With a reference system you can prepare and preset the workpiece
away from the machine, then lift it in and secure it in the machine
- quickly and precisely - with minimised downtime and consequent
better utilisation of machine capacity.

With a reference system and a pneumatic chuck on the machine table,
you have laid a firm foundation for the crucial step towards
maximised machine utilisation - automation.
Add a pallet changer to your machine and you have created an
automated production cell. A cell that can generate revenue 24
hours a day, weekdays and weekends, all year round!
Vist our OnLine Catalogue/NetStore